PTFE Fabricated Products
We combine PTFE machining with metal fabrication, fastener installation, and adhesive bonding to ship ready-to-install assemblies that reduce vendor count and validation work for OEMs.
ISO 9001:2015
Integrated fabrication, bonding, and testing system.
WPS / PQR
Qualified weld procedures for backing structures.
Certificates
Comprehensive documentation packages accompany every shipment to simplify validation.
ISO 9001:2015
Integrated fabrication, bonding, and testing system.
WPS / PQR
Qualified weld procedures for backing structures.
Coating & Adhesive Traceability
Lot-level control for every consumable.
Product Specification
Key performance ranges validated for this configuration.
- Assembly Size
- Up to 2 m
- Metal Options
- CS, SS, Aluminum, Bronze
- Testing
- Load, friction, leak, dye penetrant
- Documentation
- PPAP, FAT, custom packs
Applications
Validated use cases across industries.
- Bridge slide assemblies
- Valve seats with retainers
- Custom manifold components
- Motion system wear packages
Benefits
Outcome-focused advantages delivered by this build.
- Single PO covers metalwork plus PTFE
- Dimensional and performance testing onsite
- Simplified logistics with consolidated packaging
- Engineering team supports co-design
Success Story
Offshore operator accelerated shutdown
JV Fluoro delivered pre-assembled PTFE-stainless slide modules, slashing field welding and fit-up for an FPSO turnaround.
Installation time
-35%
Vendors managed
1 vs 4
Documentation
Single FAT dossier
“Receiving tested PTFE assemblies let us ship direct-to-site without staging work.”
Colin Wright
Project Director, BlueWave Energy
Related products
Pair this solution with adjacent formats to cover the entire scope.
Request a quote
Tell us about your PTFE Fabricated Products requirement
Share the operating conditions, target volumes, and qualification needs. Our applications team replies within 24 hours with drawings and lead times.
Assembly Size
Up to 2 m
Metal Options
CS, SS, Aluminum, Bronze